KitLog pro

Powered By Kitlog Pro v2.0

Buds Web Site
Work Logs Found: 27
Category Work Time: 219 Hours
 Date
Hours
Work Log Summary

Details

 10-22-2008
96.00
Finishing the wings and flaperons.
Details

 07-12-2008
7.00
Cleco and Rivet inboard bottom skin
Details
       

 07-09-2008
25.00
Pulled Rivet removal education.
Details

 06-23-2008
3.00
Fix stall warning device.
Details
       

 06-17-2008
3.50
Building a Stall Warning.
Details
       

 06-14-2008
2.50
Redo with one new rib, and an old one.
Details

 06-05-2008
3.00
Correcting a mistake, understanding Section 16
Details
       

 06-04-2008
6.00
Nose Ribs prepped, clecoed, and riveted to Rt main
Details

 06-03-2008
5.50
Riveted main ribs to right main spar
Details

 06-01-2008
10.00
Prepared, assembled and riveted Nose Ribs
Details
       

 05-30-2008
8.00
Main Ribs prepared and partially riveted to main s
Details
       

 05-28-2008
4.50
trimming main ribs. starting some assembly
Details

 05-27-2008
4.00
Main Ribs
Details

 05-26-2008
4.00
Deburring ribs and figuring out Nutplates.
Details

 05-25-2008
5.00
Tapped upper end of AEX's. Prepared Nose Ribs
Details
       

 05-23-2008
2.00
straitening more ribs
Details

 05-22-2008
1.00
Drill and Tap AEX tiedown
Details

 05-19-2008
4.00
Finished riveting rear spars, began "fluting" ribs
Details
       

 05-18-2008
3.00
Rear Spar, Spar Doubler, Flaperon Hinge Assembly,
Details
       

 05-16-2008
2.00
deburring doublers, riveting Flaperon Hinge
Details

 05-15-2008
2.00
Riveting Flaperon Hinge Assembly
Details

 05-14-2008
4.00
Countersink 120 degree Stub Spar Ass. Flange. Sque
Details

 05-13-2008
2.00
Hinge assembly (2) preparation
Details

 05-12-2008
2.00
Hinge Bracket Assembly
Details
     

 05-11-2008
3.00
Countersink stub spar assembly, prepare flaperon
Details

 05-09-2008
3.00
Riveting attach angles to spar
Details
       

 05-08-2008
4.00
Fabrication and clecoing wing spar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.